logo

The Main hull

The main hull building frame was set up. Sorry I didn't take any photos of this stage but it is similar to the Scarab 32 setup.

Scarab 32 Scarab 650

The panels were attached to the building frame. The chines were joined using light weight bog. Then they were sanded and faired and taped with fibreglass tape.

Scarab 650 Scarab 650

Scarab 650 Scarab 650